Jim custom fit the fascia pieces for the dormer roof - when he was satisfied, he painted them...
Then he had to design flashing for the connection of the dormer to the roof - this is a very vulnerable area. It helped that he did similar flashing before for the connection of the shed dormer roof to the main roof on the carriage house; however, that was a long time ago! He first worked with aluminum until he was happy with the design and then made the pieces out of copper. Each side has 3 overlapping pieces...
He first put the fascia board up and then the first piece of copper flashing...
This flashing is done...
Then it was time to do the other side - this is the before picture with the trim board up...
Putting the fascia board in place...
All fastened...
Copper flashing all finished!