Friday, September 18, 2026

9.18.2026

We headed back to the cornea specialist this morning.  Jim was so happy to get the bandage off that kept his left eye mostly closed.  The doctor removed the contact bandage but put another one on just for protection.  We have another appointment next week to see if they can remove that contact.  The films just dissolve, usually within 2-5 days.  She stressed that his vision will still be blurry - it takes 6 weeks for complete healing.  But Jim's vision, even with the blurriness seems somewhat improved, so we are cautiously optimistic!

He got cleared for most activities, although he still has to keep water away from his eye when showering.  All of the drops continue as well, but now Jim can put them in himself.

Goggles on, he did some grass cutting this afternoon...


 
High 71.9/Low 61.7

Thursday, September 17, 2026

9.17.2026

Jim had his eye procedure done yesterday.  I got to sit in the office and watch and - whew - nothing like clamping your eye open and scraping it with a metal file.  Jim was a tough soldier though.  After the scraping, the doctor put multiple layers of film over the eye and then a contact lens bandage, all followed by the bandage on the eye lid to keep the eye closed as much as possible.  

The doctor warned him that after the numbing drops wore off, it would probably be painful.  He prescribed pain meds and told him to be sure and take them round the clock for the 24 hours to stay on top of it.  In addition, he was prescribed two eye drops - one a steroid and the other an antibiotic.  

Jim has tolerated everything really well and isn't in much pain.  It's more the feeling of strain and something in your eye as opposed to the pain they warned us about.  He wasn't supposed to do much at all for the first couple days, trying to limit eye movement as much as possible.  Getting drops in the eye when it's mostly shut is not the easiest, but we've managed to get them in.

We go back to the doctor tomorrow.  Complete healing and surface regeneration takes about 6 weeks.  They've said his vision will be very blurry while he has the protective films on.  

We're very glad it's over and are praying that it works to eliminate the ghost images that have really affected his vision. 


As these things go, Jim got a call this afternoon that the engine shop has the block all done!  Unfortunately, it's going to have to wait until next week but it's nice that it's all ready to go.


9.15 - High 67.8/Low 43.9
9.16 - High 71.2/Low 55.2
9.17 - High 67.2/Low 59.5




Monday, September 14, 2026

9.14.2026

 Jim continues to work on parts - he's refurbishing the old hand plane he got from my printer who was retiring and going through her things.  This looks amazing - he's getting ready to paint it.


High 66.5/Low 55.4


Sunday, September 13, 2026

9.13.2026

Jim has continued to work on cleaning and painting parts...


 In addition, he has done some lawn mowing and trimming.


9.12 - High 73.9/Low 46.7
9.13 - High 75.1/Low 60.7


Friday, September 11, 2026

9.11.2026

Hard to believe it's been 25 years.  It's always a day to remember the lives lost, the heroes who stepped forward, and the families forever changed.  

Today was more of an administrative day around here.  I had post office and errand duties this morning while Jim did computer work.  In the afternoon, he went to check on the engine.  He got to see the block and said it looks great.  However, the guy broke a rod bolt and had to order them.  Hopefully they'll come in soon and he can get it finished.  After that, Jim stopped at the insurance agent to go over a few things before heading home and hopping on the elliptical.

High 72.6/Low 53.7


 

Thursday, September 10, 2026

9.10.2026

Back in the auto bay, Jim attached the throw-out bearing in the transmission...


Showing me how it works...

Continuing to clean parts...

Here's a before picture...

And an after - amazing!

Cleaned part ready for painting...


Painting more pieces...


Lots of pieces drying...


Jim used a different blasting material - this is just cleaned, not painted.  Amazing...


Jim cut grass after finishing up, and then we headed to The Local for dinner tonight.  I may have mentioned that we are in our sourdough era here, and I make multiple loaves a week.  It was just happenstance that the burger special tonight was grilled cheese burger on sourdough - Jim was in heaven!




High 77.7/Low 64.7



 

Wednesday, September 9, 2026

9.9.2026

Jim and I spent all morning trying to work things out with doctors for next steps to see if his vision can be improved after his cataract surgery.  Lots and lots of phone calls, but I think we have a plan going forward and he's scheduled for another procedure next week.

In the afternoon, Jim continued to clean up engine parts...

Where he can, he is putting things together, like this clutch fork boot on the side of the transmission...



High 70/Low 57.6 - rain in PM


Tuesday, September 8, 2026

9.8.2026


Anyone who knows us, knows that Star Trek was a quasi-religion in our house when the boys were growing up.  We've watched the originals and movies over and over, and watched all the spin-offs.  Jim and I are currently watching Strange New Worlds.  Hard to believe the first Star Trek episode aired 60 years ago today - Jim watched it when it aired!

Back on this planet, Jim continued working on cleaning parts.  He switched to walnut shells for this piece...


It really does a nice job getting all the rust off...


A coat of paint on his latest cleaned pieces...


Jim said this piece that covers some cables was completely black.  I told him we needed a before picture!  But afterwards it looked like new...




High 75.5/Low 54


Monday, September 7, 2026

9.7.2026


Hope everyone had a nice, long Labor Day weekend!

Jim worked on attaching his Soda Master to the side of the blasting cabinet.  He figured out where he wanted it and used his step bit to drill a hole for the tube and drilled the first small attachment hole as well...


Then he could put the attachment up and mark the other attachment holes...


Punching the location...


Drilling...


Putting it in place...


Attachment in place, everything put back in its right location.  He tried it out on a piece of tubing at it worked great.  The soda cleans without etching the metal.


He had to do more grass cutting at the end of the day.

High 74.1/Low 53.3


Sunday, September 6, 2026

9.6.2026

Jim opening up and organizing new parts...


Jim ordered this add-on for his blasting cabinet - it holds baking soda type material in a separate container.  That material is not reusable because it's so fine.  Jim will have to attach this to the side of the cabinet...


Jim wanted to degrease the engine compartment on the 4Runner, so he came up with a way to move the car in and out of the garage with the help of the Bobcat.  He put the trailer hitch on the 4Runner, and attached a towing strap...


I had to sit in the 4Runner while Jim pulled it out - success!


This was the compartment before...


Degreaser sprayed on...


Power spraying it off...


Pictures don't do it justice, but greasy water came out...



He did two rounds of cleaning - and it looks so much better!


Now we had to get the car back in the garage.  Jim put this board on the front of the Bobcat so that it would connect with the trailer hitch and he wouldn't make any contact with the actual car...


All back in place!


Jim sprayed all the greasy run off from the driveway and then got things put away before hitting the treadmill.


9.5 - High 72.1/Low 58.5
9.6 - High 70.9/Low 58.1