Tuesday, December 20, 2016

12.20.2016

This morning, Jim to the rest of the blocking done up to the ridge, as well as getting the rest of the mounting track attached to the bottom.


Next was attaching the bottom wall track - this was difficult because it was hard to clamp the track into position.


Making sure everything is level...


Jim had to first drill a hole big enough to be able to fasten the screws on the other side of the track to the mounting plates.


Next was putting up the first stud in this section...


Putting another stud in place...


Then adding another piece of upper wall track...


At the end of the day, all of the studs are in place for this section!  Jim stayed later to try and get the studs fastened on the back side - always a big challenge.

 
High 21/Low 16 (wind chills never out of the single digits!)
 