Tuesday, May 17, 2016

5.17.2016

Jim made the last piece of valley flashing this morning - yay!


We're continuing to do lots of things to organize and clear up floor space in the shops.  Jim moved these two windows to the upper landing to get them out of the shop.


We spent time sorting and moving all of the Miratec trim boards into the shop.  We'll be starting to paint them soon.


Jim got the drip edge installed and then was back to work doing shingles.


Putting up the next roof jack...


Doing some measurements to make sure that everything comes out right at the top...


The last snow guard on this side of the roof!


Taking measurements and getting things ready for the peak drip edge...


Jim made the peak drip edge...every piece of this flashing is like a work of art!


Installing the peak drip edge...


Starting the last row!


End-of-the-day shot...looking fabulous!

 
Jim used the remainder of the day to cut some grass - home owner chores before the home is built!
 
High 64/Low 39
 

No comments:

Post a Comment