Hope everyone had a happy and safe Labor Day! Everyday is kind of Labor Day around here, but we enjoy the journey!
Jim had some monthly house jobs to do this morning and then he got his tools and equipment outside. Then he moved the scaffolding out of the pavilion area and took down the last brace...
Now that the main and secondary beams are in place, the next step is to peg the joints. Jim wants to make sure that every post is completely square and plumb and all the joints are tight. He put up a winching strap between the two posts on the end beam and was coming up with the best way to be able to move the front post's position just a tad to straighten it.
Checking to see how plumb the post is...
Continuing to work on straightening...
Look how tight and perfect this corner joint is!
All done - looks so cool! This peg went through the beam, the tenon of the post, and into the secondary beam.
No comments:
Post a Comment