Friday, September 15, 2023

9.15.2023

 I had grocery errands this morning.  By the time I got home, Jim had gotten everything up to the pavilion and had started working.  He strapped the front wall section to pull everything tight before pegging...


Starting to drill holes for this top joint...


Putting in the peg from the other side...


Working on the bottom joint...


Working on the brace joints on the opposite front corner...


Once the front corners were done, time to move the straps and tighten the middle connections...


Pulling everything tight...


Using the auger to drill through the post and beams...


Working on the top pegs down through the beam and post...



High 65.1/Low 45.5 - beautiful!


No comments:

Post a Comment