It worked out well because Jim did insulation work for a good chunk of the day and I got some fire school work caught up. It was a warm day for insulation work though so I felt bad thinking about Jim working on it!
Besides insulation, Jim did some electric work too - there are a couple places in the apartment that he's decided to do things a little different. One of those is the outlet underneath the sink. He has decided that there will be a baseboard heating unit there and he wanted to be able to plug it in along with the garbage disposal. So he got that all switched out.
Back outside later in the afternoon, Jim spent his time working out details on the siding where it meets the overhang area. This is just an example of one of the strange pieces of siding he had to cut!
Doing all the cuts and fitting the siding right up to the overhang...
This is a picture with that crazy J-shaped piece of siding installed. He just has one more little piece of siding to put on and this side will be done up to the overhang!
The other side is just about done too...just a couple more little pieces.
While he was waiting for some pieces to dry before he could install them, he put up one of the recessed light fixtures underneath the overhang.
High 82/Low 60 |
No comments:
Post a Comment