Jim worked in the metal shop today - he had to empty all three of these cabinets, move them out of the way for drywall, and then temporarily put everything back inside so that he had room to work.  Whew! 


He put his saw outside so that he could cut the baseboard pieces...


Baseboard installed for this wall section...


He had to take all the receptacles out of this area...


Then he stuffed insulation in the wire path...


Then it was time to start on drywall...


The beam makes moving pieces of drywall over to this section a bit harder...


Cutting out the receptacle area...


Next piece of drywall up - a full piece with no receptacles, which always makes things easier.


Next piece up...


Cutting out the receptacle...


Then the last piece on this back wall - but it's a tough one with a receptacle and conduit at the top...


Cutting out the receptacle...


Before he can put the last piece up around the conduit, he had to put the J-channel in place...


Putting the last piece up around the conduit...


Rounding the corner, putting up the first piece on the pilaster...


All of that done, time to start rewiring all the receptacles...