Jim worked in the metal shop today - he got the banjo going and taped all the new drywall...
Plastering the tape...
He got the joints on the back wall of the auto bay done as well...
In the afternoon, he headed outside to do his final tweaking of the driveway area. He got all the tools ready to go, moved the power washing equipment up to the upper driveway, and then oiled the forms...
Kyle came up mid-afternoon - he had a site visit in the Catskills so he was able to do that and then head up our way! They were able to get some relaxing time in as well as walking through tomorrow's pour. Always good to have him here!