Today was another cold day and the land was muddier today than after the snowfall because it got so cold the last few nights and froze.  Then when you walked in it after it started melting...it resulted in mud again.  So Jim continued his inside electrical work.

Jim modified one of the T-boxes so that he could run conduit out from both sides of the box.


He continued running conduit to the next light fixture.


Then it was time for wire!  He put the 3 spools (hot, ground, neutral) on a spindle so that he could pull all 3 of the wires out together.


Then he could tape them together and pull them through the conduit and into the light fixture.


Now that it's all wired, he put the light fixture together with its reflectors.  Bulbs are ordered and Jim just got an email that they are ready to be picked up at Home Depot.  So soon we'll have working lights!

 