Thursday, December 3, 2020

12.3.2020

 Now that some projects are crossed off his list, Jim was actually able to do the first woodworking in the shop since spring!  He started gluing up some wood to make the shelf in the stairwell...


He also started putting some of the stairwell things back into place - like hanging up our coat racks...


Then putting on the bottom handrail...


After lunch, he headed into town to get more diesel fuel and to take a big mound of accumulated cardboard to the recycling center.

Then he started reassembling the wall in the metal shop after getting the wiring for the pole barn into the box.  He put the piece of drywall on underneath the box and then stuffed insulation in the voids...


Next was the batt insulation...


Putting drywall back into place...


Jim had to modify the last piece of drywall to fit around the complicated conduit path.  Putting the last piece into place...


High 41/Low 26