Wednesday, December 30, 2020

12.30.2020

 Jim started drilling the holes for the plumbing in the sink base this morning...


All done!


Another coat of polyurethane so everything is protected...


Jim did the hand millwork on the back of the sink cabinet face frame...


He test fit the sides to make sure all was well and then put a coat of primer on the back...


Working on the next piece of drywall in the metal shop.  These front pieces are complicated by the fact that we switched sizes of insulated concrete forms to allow for the brick ledger.  So the flanges don't line up between the two sections - Jim has to mark extra lines for fastening to make sure he hits the flanges when putting in the screws.


Jim cut the top corner of this piece and he will do custom work around the conduit and beam later...


Cutting the receptacles out...


Putting up the last piece for the day.  Jim also cut the top of this piece so that he can put up a bigger piece around the beam for strength...


J-channel in under the beam and more fastening work done...


That's the last drywall for the day.  The next pieces will require Jim to take apart the wiring.  Since it was almost time for him to hit the treadmill, that will wait until tomorrow.

Jim continued to spend time on the phone, trying to get questions answered and issues solved for both the lights that are ordered for the metal shop and the car lift which will soon be ordered!  

High 29/Low 25