The heater unit for the kitchen is located on the floor underneath the sink cabinet. Jim had to design the base of that cabinet to have an access panel so that he can get at the heater to clean it or do any required maintenance. He started making pieces for that this morning...
Once he had the millwork done, time to glue it...
Assembling/glueing the frame...
He also started the millwork on the face frame of the sink cabinet...
Making the pocket screw holes for the face frame...
Face frame assembly all done...
Next Jim sanded all the side panels for the cabinets...
Starting to paint them gray...
All done and drying...
The other two are drying as well...
Then it was time to clean up the paint gun before coming up to get ready for church.
|
High 28/Low 17 |
No comments:
Post a Comment