Saturday, September 21, 2024

9.21.2024

With all the deliveries over the past couple days comes lots of clean up and sorting what is recyclable and what is trash... 


Jim got the greasing done on the power trowel and then brought in the Bobcat with forks to move it...


It's all tucked in the pole barn for now.  Jim may put wheels on this pallet so he can easily move it where it needs to go...


Jim wanted to move the treadmill over just a bit to accommodate the new exercise bike, so it was a good time to clean it off...


Then he moved it over a bit so we have more room...


Always maintenance to do - Jim checked the oil in the Bobcat...


One more delivery - a bigger portable air compressor.  Jim had one this size but it died - he needed one that would be able to spray oil on the concrete forms.


Then it was time to move some gravel!


Starting to put gravel on the driveway...


Continuing to dump gravel and smooth it out...


The edges require some hand shoveling...


Working on the other side...


We moved everything out from underneath the pavilion and Jim cleaned it up a bit...


Then he dumped a load inside...


Driveway is looking good!



High 77.1/Low 55.2







No comments: