Jim started making moulding for the bathroom window repair...
He also continued some moulding work in the hallway...
In the afternoon, he headed outside and worked on greasing the Bobcat - it's going to be doing a lot of work coming up so it needs to be ready!
Then Jim took the Bobcat up the hill and did a little flattening of the driveway area to make working on it easier...
Then he used the excavator thumb to fill the bucket with some of the rocks he had previously dug out...
He dumped a bucketfull of rocks down in the lean to area...
The thumb works amazingly well - sure saves time and Jim's body!
This is the rock wall that we are going to work on extending - Jim dumped rocks in that area as well...
|
High 71/Low 55 - gorgeous! |
No comments:
Post a Comment