Another on and off drizzly, chilly day.  Jim started off by doing some more work in the attic on the run for the bathroom vent.  You can see how difficult it is to get pieces of vent up through this access door! 


He then spent the majority of his day down in the woodshop.  He got a frame built for the first section of window jamb - it really looked pretty in the window. 


Jim was so anxious to get back to work on the pole barn but the weather was just really iffy all day.  He brought all his tools out once only to have to drag them back almost right away.  The sun finally came out to stay about 4:30 so he headed out then.  He did a bit of adjustment on a couple of rafter tail positions and then did more fastening on the two pieces of sheathing in place.  He also put up a 4' section that he already had cut.  Pictures to come!
High 50/Low 27 - freeze warning!