Saturday, July 1, 2017

7.1.2017

Wow - how did it get to be July already?  Hope everyone has a safe and wonderful long holiday weekend!

It was on/off rainy day so we planned to just work inside today.  Jim started out in the wood shop - he spliced into the line for the toilet in the bathroom...


And then he ran the line up onto the ceiling and down the wall for the urinal.  He got it all fastened except that he needs to get more wood to make blocking.


The rest of the afternoon was spent on insulation.  Jim worked on the two remaining windows in both bedrooms...


Once those were done (yay!), he started working on the sides of the entry door.  As opposed to the windows where for the most part everything is covered, you can see the loose insulation here as he pushes it down.


I got the rest of the package of loose insulation all combed and put in bags.  We'll use it in the wood shop when we start working there. 

Meanwhile, Jim switched to fiberglass and worked on finishing up around the window.


Looks amazing!  So many walls look totally done now - it's very exciting!


Jim got fiberglass batting in the first valley rafters - these are in the closet of the second bedroom.


Jim continues his testing of the Pex system - he's doing 70 psi now which is what the inspector requires.  So far everything is great - he's putting green stickers on the ones he tests.  Just a few more to go.


 
 
High 77/Low 63 - rainy

 

No comments:

Post a Comment