Friday, May 28, 2021

5.28.2021

Jim cleaned up the shop after our tile work and started getting ready for next steps.  He also cut some of the wood he bought from the local sawmill to make some extra shelves in the pole barn...


Pieces cut...


Jim started working on installing the next cabinet door - this one required everything out and Jim drilling holes for the hinges on the backside - not the easiest task when you can't see...


He also made and installed a little block at the top corner to stop the door...


Looks amazing!


Didn't take me long to get it all filled back up - this is a great storage area.


Jim divided a new bucket of plaster today and made a skim coat mixture in another bucket that he'll use in the wood shop...


Doing some plaster work in the metal shop...


High 48/Low 39 - cool and rainy!


No comments:

Post a Comment