This morning, Jim brought up my cabinet doors to install!
Look how gorgeous they look! Just two more to install. Jim hadn't put some of the hinge hardware on the inside of the cabinets so those will require more work.
Jim got both of the post assemblies put together so that his next step was to get them separated and into the general area where they will go.
He brought the Bobcat inside the auto bay and carefully lifted one of the posts with the forks...
Then he set each end down onto one of the car dollies...
He was then able to just move it around!
Time for the second one. He got it lifted up and then removed the blocking...
Then setting this post down onto the dollies...
Moving it into place...
Both posts are in the general vicinity where they will go - this was a huge step to complete!
Our next project was to move all the rebar that Jim had stacked up against the front wall of the metal shop. Besides taking up valuable floor space, he needs to be able to work in this area for plastering. So Jim dragged a few pieces out at a time and I grabbed the other end and we stacked them up on the Bobcat forks...
Tied down and ready to be transported up to the top of the hill...
We put Jim's newly-made cradles on top of the blocks and then re-stacked the rebar...
In between other tasks, I gave the floor another good scrubbing - it really looks beautiful!
High 70/Low 41 |
No comments:
Post a Comment