Monday, May 18, 2020

5.18.2020

Jim continued work this morning on the cabinet pieces - sanding before more polyurethane...


Putting Formica on the last fixed shelf...


And working on the face frames.  Even though the shelf on the right goes all the way over to the wall, that section will be hidden by the adjacent cabinet so the face frames will be a matched set with 4 doors.


Another coat of polyurethane on the pieces...


Then it was time to do some garage door opener work.  First step today was to mount the control box and run wiring...


Control box and bottom sensor mounted and wiring all run and tacked in place...


Working on the other side - not much room here to work!


High 63/Low 44

No comments:

Post a Comment