It was a crazy warm day for February - the high got to 64 degrees! So Jim took advantage, opened up the garage door, backed the Bobcat out and did a little cleanup. The floor gets pretty messy with the Bobcat dripping snow and gravel after plowing. Plus it allowed Jim to do a little organizing while he was at it. Good timing because snow is in the forecast for tomorrow!
Jim did some sweating of the supply run to the stairwell manifold that he was fitting yesterday. He's waiting on more parts to be able to go too much further.
So he turned his attention to putting up some drywall on the outside of the utility room!
Door's all cut out and the beginning of this wall is all finished! Makes it look even more like a real room!
Later in the afternoon, Jim transitioned back to plastering. Besides just a couple of loose ends, the master bedroom is all done! He even got started on the tapered joints in the living room!