Tuesday, February 20, 2018

2.20.2018

Jim was able to get up the driveway without too much issue this morning.  Good thing, because he had a bucket of plaster as well as the back wall of our shower stall to unload. 
 

 

Jim worked more furnace design this morning - figuring out the supply run from the pump to the stairwell manifold.  Getting complicated to see individual runs with so much plumbing here, but this run is the top horizontal line that goes diagonally down to the back wall where it will connect to the manifold.
 

He put a coat of primer on the area where the mounting board will go so that it will be protected underneath.  He did the same in the woodshop bathroom behind the urinal so that can be mounted also.  In this picture you can also see that he figured out hardware to attach the filter to the bracket so it's ready to go too.


A coat of primer on the mounting board...

 

Then it was back to plastering in the afternoon.  He has the corner joints done except for a few loose ends and started working on the corner bead.  The second coat on the screws is done and he started putting the final coat on those.


High 53/Low 47 - some drizzles

 

No comments:

Post a Comment