Jim worked on putting up the next light in the auto bay...
Then he did more fiberglass insulation in the utility room! We'll be ready to do drywall here soon.
Early afternoon, Jim got the call from the truck driver that he was almost at the property with our new furnace! Jim was waiting at the end of the driveway with the Bobcat to get it off the truck.
All unloaded and starting the trip up the driveway...
In the shop!
Now to tear apart the crate!
There it is!
All uncrated - now the fun really begins! Still hard to believe that something that small will heat this big building!
After we got back to work, it was time for another piece of drywall in the wood shop. Jim notched the top, we marked it and carried it over. Then Jim backed it into place...
Fastening it... We said that this was probably the easiest piece in the shop - no outlets, no windows!
One piece of drywall per day is adding up to a lot of coverage!
Then it was back up into the apartment to do some taping in the master bedroom...
Working on the ceiling joint...
Continuing to tape...
After the little nook was done, Jim moved into the closet and got everything taped except for the angled joints.
Then he started taping in the main room...
High 39/Low 27 |
No comments:
Post a Comment