Monday, May 29, 2017

5.29.2017

Jim worked on more plumbing today - I love how all of the Pex looks going up the wall!


Jim ran the cold water line over to the bathroom sink.  If you look closely, you can see an elbow connector on the wall for the line that will go to the toilet.


In the apartment, Jim figured out where he wanted the line to go for the toilet and drilled the hole.



Jim figured out the placement for the lines to go to the sink and got both lines connected and capped.


 
This is the back view of the bathroom sink and all the work involved getting the lines connected.


Switching over to insulation, Jim made the foam board base pieces for the utility wall area in the bathroom.  Then he put up the ceiling baffles.


He also finished putting ceiling baffles in the kitchen valley rafters...


 
Then Jim put more insulation in the living room walls...

 
Living room wall progress...
 
 
Meanwhile, I stuffed pieces of insulation in the various studs and brace pieces in this bathroom wall.
 


Jim switched over to the bathroom/stairwell wall - this wall needs to be finished before we can put the last ceiling insulation in this area.
 


End-of-the-day progress on insulation in the bathroom...

 
After I left, Jim continued working - he made some mounting brackets for the toilet water valves in the utility room bathroom (picture to come!)
 
High 56/Low 50
 

No comments: