Wednesday, September 28, 2016

9.28.2016

A big portion of the day was spent getting things ready for our trip.  Jim got the dozer blade all strapped down.  Plus, he had to get together tools, oil, whatever he may need just in case, God forbid, something happens along the way.


He got another section of scaffolding on the side.  It must be that time of the year, but the wasps have been terrible and they were really terrible today.  So much so that Jim couldn't work on the front section - they just were swarming.


Instead he worked on making more trim.  He also installed the trim boards for the side doors.  Putting up the right side...


...and then the left.


Lots of caulk before and after installation...


I got another 100 shingles painted and more unwrapped.

 
High 66/Low 47
 