And putting a coat of polyurethane on the sash in the wood shop.
He also attached all three of the inner frames for the windows in the wood shop...
The plan was to paint the stairwell dormer gray after lunch but as Jim went out to get things set up, it was pretty cloudy and there was a slight chance of rain. Wasn't worth the risk of starting, so he moved on to other work.
He put the weather seal back on the man door in the pole barn; he had taken it off when he was painting.
Speaking of painting, Jim cleaned up some things in the pole barn in anticipation of painting the garage door panels. He put tarps down on the floor, got sawhorses set up, and put the first two panels up. We want the door gray so Jim has to rough up the surface of the doors so that the paint will stick.
Before cleaning up to get ready for church, Jim got 3 of the 6 panels all prepped for painting.
High 69/Low 49 - bit cloudy |
No comments:
Post a Comment