Wednesday, April 24, 2019

4.24.2019

Jim continued working this morning on the microwave cabinet.  He started just fitting things together where they will go and trying to figure out how best to make a shelf so I have some storage room in this cabinet around the vent pipe.


He has to do some hand work on the back of the face frame but he was showing me how it's all going to fit together.


He's putting these ledger boards on the wall - that way he can put the cabinet up on top of these boards and it will be in the perfect position...


Trying it out for size - perfect!


Doing some hand sanding on the workbench top - he got about half done...


It was much cooler today - about 20 degrees cooler plus a brisk wind.  But we went down to work more on the gravel by the driveway.


 We got another big area done - here Jim's blowing the leaves off the driveway...


Next it was time to clean up all the big timber from the tree Jim cut down yesterday - loading up the logs on the forks of the Bobcat...


And dumping them up on our ever-growing pile!


We also picked up the smaller logs left from the tree we cleaned up earlier...


All cleaned up - ready for the next one to come down!


High 51/Low 35


No comments:

Post a Comment