Sunday, June 4, 2017

6.4.2017

Jim worked on building the first overhang piece for over the double doors...


He also made the next trim board piece for the kitchen vent...


Then it was back to insulation.  Jim started by stuffing the stud with loose insulation...


Then put up the batt in the laundry room/entrance.


This is a narrow cavity so Jim has to cut each of the batts lengthwise...


This row of ceiling insulation is done!


In the time we had left, we started working on the bathroom wall - I had previously stuffed insulation in the studs.


Putting up the last section...

 
Jim worked on a little more steelwork after I left before he had to come home to get ready for church.
 
High 63/Low 51
 