Although it's tough to see because there is so much to look at, Jim worked on fastening down all the multi-media wiring. You can see it's all going down the shower wall and into the wood shop bathroom area.
We still aren't 100% sure where the tv will go in the living room - Jim ran the wires to the corner so we have time to decide which way we want it to turn after that.
Poor Jim continued to work on plumbing today too. It's being so frustrating. So much for using stainless. He's about ready to call uncle and use something else - he's never had these issues before.
After lunch, it was back working on siding.
Finishing up the bottom row now that the corner trim is all done.
Making good progress filling in...
End-of-the-day picture...
Jim stayed later to do a little insulation and car work. Unfortunately, I'm still banned from helping him with insulating since I got that bad skin reaction. He did some tougher areas - around the pipes in the bathroom. He basically split insulation in half, tucked the unfaced side around the pipe and then will use the faced section for the top. He did the same with the stack...