Hope everyone had a Happy Memorial Day and took just a little time out of your day to think of all those who have died to protect our freedoms.
In the shop today, Jim started prepping wood to make baseboard moulding - putting glue on the pieces...
Hope everyone had a Happy Memorial Day and took just a little time out of your day to think of all those who have died to protect our freedoms.
In the shop today, Jim started prepping wood to make baseboard moulding - putting glue on the pieces...
Jim did some more design work on the baseboard moulding today - it's made more complicated because of the steel stud wall framing - he can't easily attach moulding to that. So he's going to put a plywood piece in place first - he'll be able to fasten that to the framing with screws.
Jim had to turn on the heat last night - it was 39 degrees in the evening! It just came on for a bit early this morning - we're loving the cooler weather!
Jim ordered new cutting blades for the moulder so he started experimenting on the baseboard design...
Jim cleaned up the shop after our tile work and started getting ready for next steps. He also cut some of the wood he bought from the local sawmill to make some extra shelves in the pole barn...
This morning, Jim brought up my cabinet doors to install!
Look how gorgeous they look! Just two more to install. Jim hadn't put some of the hinge hardware on the inside of the cabinets so those will require more work.
Jim got both of the post assemblies put together so that his next step was to get them separated and into the general area where they will go.
High 70/Low 41 |