Sunday, March 7, 2021

3.7.2021

Jim went out to the pole barn attic today and brought down my St Patrick's Day and Easter tubs - hard to believe it's that time already!  

Then - be still my heart! - he started getting things ready to work on the Corian countertop!  This is basically the size it will be - it's going to be amazing!


You can see Jim's steel pieces underneath that he welded together to make sure he has a nice flat work surface...


My paper towel drawer is all done and ready to be assembled!  But Jim is going to leave it to harden up for a couple more days before he brings it upstairs.


Then it was getting the banjo ready and starting to tape the drywall in the wood shop bathroom...


This is a very complicated area - he's either working over the toilet or the sink plus he has to watch out for the trusses!


Continuing to work around the room...


He had to take off the breaker box cover to tape on this wall.  He'll eventually have to move the sink and the temporary shelf for the electronics too.


With the time and plaster he had left, he started taping in the metal shop...


High 32/Low 7


No comments:

Post a Comment