Friday, March 5, 2021

3.5.2021

Jim sanded the rest of the drawer pieces for their last coat of polyurethane... 

                  

Then he worked back down in the wood shop bathroom this morning, organizing all the network and cable wiring...


Putting drywall and corner bead up in the area behind where the box for the electronics will go...


Time for corner bead on the wall areas...


First coats of plaster all the J-channel and corner bead done...


With the time and plaster he had left, Jim worked in the metal shop - putting corner bead up...


Corner bead attached...


Then continued plastering more corner bead...


Continuing on until the plaster was gone...