Saturday, January 9, 2021

1.9.2021

Jim made some blocks that he will use to attach the hinges for the tilt down drawer.  They will also serve as stops when the door closes... 


Then he painted the face frame of the refuse cabinet gray...


He also painted the sink base drawer front and put a coat of polyurethane on the blocks...


He worked on straightening the other 2x4" on the side of the beam today - he has the drywall cut and ready to be attached to this area too.


Then it was time to work on wiring - he started pulling through the wire for the 240V circuit...


Pulling the fish tape through...


Once he got it to the pull elbow, he had to pull it through and get it to switch directions to the next conduit run...


Pulling the circuit wiring through...


He eventually got it over bit by bit into the box!  Then he had to pull back all the excess wiring and feed it back through the armor cable to the receptacle.  Whew!
 

Time for church!

High 30/Low 12