Saturday, January 23, 2021

1.23.2021

Jim cut the piece for the bottom of the drawer cabinet today... 


Then cut the front piece from maple and did the millwork to join the two together...


Glued and drying...


With some of the steel that Jim picked up yesterday, he made a stud in the wood shop bathroom.  He'll use this to attach access doors behind the storage cabinets he'll build here.  That way if he ever needs to work on the plumbing, he'll be able to do it.


He also picked up furring strips yesterday and is starting to cut them - he will use these to attach the metal shop lights to the bottom of the steel decking...


Time for church...
High 18/Low -1


No comments:

Post a Comment