Friday, January 29, 2021

1.29.2021

 

We're definitely in a deep freeze.  When I woke up this morning, the actual temperature was -5.  Brr...

Jim worked on figuring out how to finish the wall and access panel area in the wood shop bathroom.  Bottom piece up and metal J-channel attached...


He also had to put blocking behind the steel studs to use when attaching cabinets...


Cutting drywall...


The drywall is all in place now.  Unfortunately, Jim needs more metal J-channel.  They didn't have much at the Drywall Center last time he was there and it wasn't the right size.


Next job was to get ready to paint the gray on the drawer cabinet pieces.  Sanding the primed area...


Bottom panel painted...


Spraying the side panels...


High 14/Low 0


No comments:

Post a Comment