Wednesday, January 27, 2021

1.26.2021

Now that Jim has the polyurethane on the drawer cabinet panels, time to tape off that section so that he can prime the maple fronts...


Priming...


The first one done and drying...


A coat of primer on the side panels...


Jim cut the MDF to use for his table saw side table and then cut the black Formica for the top and sides...


A coat of polyurethane on the MDF so the contact cement will bind better...


We got 6" of snow from yesterday through this morning, so Jim had to get the Bobcat out and do some snow blowing. 


Tomorrow will be a big day - the car lift is going to be delivered.  Jim spent more time today talking with his sales rep as well as the shipping company.  It's going to be very difficult getting it off the truck, let alone up the hill and into the auto bay.  But one step at a time!

High 29/Low 11 - 6" of snow


No comments:

Post a Comment