Saturday, January 30, 2021

1.30.2021

Another frigid night - it was -9 when we woke up this morning!  Definitely a two hat day.  Or better yet, an inside day!

We officially have the best FedEx delivery person ever.  Jim was in the metal shop yesterday evening getting ready to work out when he heard some noise outside.  The FedEx driver had walked up the hill carrying the power unit for the car lift - this big box weighs over 60 pounds!  Plus the hill is icy right now which had to make it even more impossible.  Amazing!


Jim worked in the wood shop bathroom this morning, planning out the next phases of finishing.  He made a temporary shelf to move over all our electronic components.  That way, he can finish the area behind the box.


A coat of polyurethane on the bottom of the table saw side table...


In the metal shop, Jim finished up his 4 joists for underneath the steel table and then sorted and stacked all his metal scraps to get them organized and off the floor.


Another view - everything looks so good!  Jim said it was good I got a picture because it won't look so clean and neat for long (although he keeps everything clean and neat!).


Then he started working on attaching the steel furring strips to the bottom of the deck to use to fasten the lights.  He had to figure out best placement, based on where he needs light over his steel table and how he can best get things wired.


High 20/Low -2

No comments:

Post a Comment