Jim cut pieces and did the millwork for the spars that attach to the back panel of the drawer cabinet...
Stapling them to the back...
In the metal shop, Jim cut this small piece of drywall, attached J-channel, and glued it in place at the end of this beam just for completeness...
He did the same thing on the other side near the garage door...
Jim's new lights for the metal shop finally came in after probably 2 months...
Lights out - Jim needs steel furring strips to attach them to the bottom of the deck and doesn't have any long enough. But since he has to order a couple more studs for the wood shop bathroom, he'll add those to his order when his rep comes back to work on Monday. Meanwhile, Jim is figuring out exactly where he wants to place the lights.
|
High 36/Low 31 |
No comments:
Post a Comment