Sunday, January 17, 2021

1.17.2021

 Jim continued working on the pieces for the front panel of the refuse cabinet today...


Pieces cut to size and millwork started...


Using the shaper to make the cuts on the back of the panel...


Millwork done!


Jim was showing me how it will look on the front of the cabinet...


For the first time since we moved here, Jim stopped work and came upstairs to watch the Browns in the playoffs.  But by halftime it was looking bleak so we stopped and he headed back down to the shop.  If they pull it out, we'll use our NFL package to watch it later.

Attaching the face frame to the refuse cabinet...



High 34/Low 25













No comments:

Post a Comment