Thursday, January 14, 2021

1.14.2021

Jim got the maple front on the other side panel for the kitchen drawer cabinet...


Then it was back to work on drywall, finishing the little piece next to the door...


He first finished putting the rest of the fasteners in the drywall on the corners of this area in the wood shop bathroom.  Then he got his plaster and tools out and put the corner bead on...


These corners are done.  He needs to put another stud in the wall cavity where the utilities come up so that he can fasten any shelving units.  He went out to the pole barn and investigated his supply but he didn't have a piece long enough so he'll have to get some more steel.


At the end of the day, he took the trash down to the street and then headed into town to get stocked up on diesel fuel.

High 34/Low 21