Tuesday, March 7, 2017

3.7.2017

Jim worked all day today on running internet and tv wire.  Here is the media box in the second bedroom (which will be my office) with both of the wires in the box.


Then...he got all the rest of the media wire strung - tv in the kitchen, tv in the master bedroom, internet in the living room (where Jim's temporary office will be) - all brought over to the bathroom.  Once the shower wall is built, all of these wires will go down that wall and into the bathroom of the wood shop, where Jim will have a shelf for all of the media hardware.  The only media wiring left to do is both internet and tv to the tv in the living room.  We have an idea of where we want the tv to be hung on the wall, but Jim is going to draw lines on the floor for our furniture to make sure the placement will work out.

 
High 43/Low 38 - kind of drizzly
 

No comments:

Post a Comment