He did more blocking in the kitchen - all of the top blocking for the lower cabinets is now complete.
Another view...
Then he went down into the wood shop and worked on receptacles. He got 2 GFI receptacles completing swapped out and got 7 boxes redone to put the extra fastener into the stud. This requires Jim to pull all the wires out of the box so that he can drill through the box. He got 7 boxes redone today - so he now has 2 of the 5 circuits finished in the shop.
Then it was back to working on lights in the wood shop - today was getting the wire to the new lights. You can see that it's not easy - wires have to go through all the conduit, in and out of the pull boxes and into lights. He got one back of two lights totally working this afternoon!
High 36/Low 19 |