Jim spent the day working - and reworking - the wiring for the stairwell/metal shop. 

Because it was hard to get another cable through the conduit into the metal shop, Jim had to rethink the 4-way light switch circuit.  He decided to pull power out of the receptacle box on the upper landing, which required taking out the old wiring and running another cable to that box.  This picture shows the cable hanging and going into the box.  Then he wired the cable into the box where the GFI breaker was, anchored it along the path up to the upper switch box.  In order to do that, he had to pull out the wiring in that switch box and redo it.

Then he finished wiring from the switch box in the metal shop to the light fixture.  So at this point, Jim has to just put switches in 2 of the boxes and then it will be done! 

 
 
High 33/Low 13