Thursday, January 19, 2017

1.19.2017

Jim had another good progress day at the property - he said he had to do a little steel work, so he made and fastened these pieces of block to the rafters in the second bedroom.  He will use these to later attach the closet wall after the drywall is up.


But then he worked on electric work - concentrating in the bathroom.  He got the wire run to all the receptacles and light fixture, got things pigtailed together, and even got the circuit connected to the breaker box!

 
At the end of the day, he headed out to Lowe's to pick up more electrical supplies as well as more wood for door frames (again cutting the wood to size in the parking lot so it fits in the back of the car!).
 
High 41/Low 24
 

No comments:

Post a Comment