Sunday, October 5, 2014

10.5.2014

Wow - no more scaffolding inside the building!  Everything looks so clean and, stay tuned, Jim said tomorrow it might look even cleaner!


Jim did more grading and then compacting the gravel in front of the garage doors.  He needs to bring the excavator inside to work on some digging for the plumbing so he wants everything in good shape for that.


I worked some more on chipping the old cement off the steel - but was on call for when Jim needed help cutting or holding in place the dimple board.  This is around the side of the building...he's got it graded and built up really nicely.  This is the drain pipe for the downspout.


This isn't easy - this dimple board is very thick plastic with a thick geo fabric on the underside.  But Jim has to cut a hole in it where the footer drain comes out.


Success!


More drain pipe for the downspout added.


Then we moved around to the front area - this piece has two thimbles Jim had to cut around!

 
At the end of the day, Jim wanted to jump the battery on the lawn mower and cut a little grass...but, it apparently isn't a battery issue.  So add fixing that on to the list of things Jim has to do.  It's always something!
 
 