The steel roofing company didn't bend the hip angle to the measurement that Jim requested, so thank goodness he has a brake long enough to bend it...
Then it was back to work outside on the back hip to do the Z-flashing...
Measuring and cutting pieces...
Starting to put up the flashing in between the roof panels...
Continuing to work on flashing...
Working on the other side of the hip...
Time to put the hip trim up...
Amazing how this long piece can slide up both sides of the flashing, especially considering that the flashing is individual pieces. That's where you have to be really accurate putting it up!
Jim still has to work on the very bottom flashing but both hip trim pieces are in place on this side!
|
High 84.5/Low 60.3 |
No comments:
Post a Comment