Jim got all his tools and equipment out to the pavilion and then started working on the back side. First pieces up...
Getting set up to cut the next piece. These metal panels get so hot in just a short time out in the sun.
Cutting...
Putting in the clips on the previous piece...
Placing the next panel...
Cutting the next piece...
Hemming the next piece...
Back up the scaffolding to install the first full piece in the back...
The shade was over the front, so Jim wanted to put more pieces up. Doing measuring...
Jim had to make sure things were set after working in the back because the standing seam has to go on the opposite side so that everything clips together. Cutting the next front piece...
Placing the next piece...
Measuring for clip placement...
End-of-the day picture!
|
High 86.4/Low 67.2 |
No comments:
Post a Comment