Friday, December 27, 2019

12.27.2019

It was a very foggy day - a wonderful day to just stay inside!

In the shop, Jim worked on sanding the face frame of the corner cabinet...


He also got the Formica glued onto the half shelf...


Then he started working on installing the next 2 drawers in the kitchen cabinet.  He had to figure out placement first and scored a line and punched holes for screws on the side of the cabinet...


Drilling the holes...


Jim had put tape over the existing slides so that no sawdust would fall into them.  They have grease inside and that's not a good combination with sawdust.  Cleaning up...


Attaching the first glide.  These are the new ones that he ordered online; he likes the quality of these over the ones from Home Depot, although those work well too.


Once the glides were in place on one side, time to repeat those steps on the other side...


Putting the glide in place...


He already had put the glides on the first drawer so it was time to test it out!


Then he put the glides on the next drawer and brought it up!


However, in order to get every drawer fit so that they fit perfectly in the cabinet and worked together took some tweaking.  You can see that they are designed to fit with no wiggle room!  The cabinet is gorgeous - time to fill it up!


 At the end of the day, time to put another coat of polyurethane on...


High 37/Low 30 - foggy!

No comments:

Post a Comment