Wednesday, January 23, 2019

1.23.2019

Jim continued working in the metal shop today.  Since I picked up the clamp he needed, he was able to finish the conduit path for the air compressor line.


Around to the auto bay side...


Next, he worked on mounting his hose reel, putting it up high enough that it was out of the way yet still accessible to him.


Putting the hose reel up...


Some hose is all wound up now!


Now that the conduit is all attached, time to put the rest of the wire through for the compressor.  Jim put the fish tape through and then had to split the strands and attach some through the eye and get it all taped up for the trip back through the conduit.


 Pulling the wire out...


While I helped feed it through and keep it from twisting...


Next was the green grounding wire.  The conduit is full now so it was quite the workout for Jim to push the fish tape through this path and then pull it out again with the wire attached.


But he got them all through the turn box and over into the auto bay...


Getting the compressor motor wired up...


All wired and closed back up...


Jim still has to get the armor cable for this side but for now, things are in great shape!


High 30/Low 30 - winter weather advisory - wintry mix


No comments:

Post a Comment