Sunday, January 13, 2019

1.13.2019

Now that Jim had the new roller brackets, he was able to get them installed.  A closer picture...


Both sides done...


The next step is to get the cable made and then he will be able to work on attaching that and working on the spring.  Getting closer!

After that, he went back to electric work.  He got the boxes installed using his hammer drill and then ran the wire for the 120V line.  He also made and installed all the nail plates.


He had to cut a new path in the foam to take the wire up to the existing horizontal pathway and around to the junction box on the other side.  So the 120V line is all run in the auto bay and pigtailed at all the receptacle boxes!


Jim is out of these receptacle boxes that he likes - he put in an order for a case of them online.  Great progress!
High 19/Low 1